Energy Efficiency Analysis for a Multi-Story Research

A 4-pipe chiller/boiler system is a typical HVAC system used in many commercial building types, however, ASHRAE Standard 90.1-2007 minimum efficient WSHP systems have recently become a popular choice to replace outdated HVAC systems.

CPD 1 2014: Introduction to Part L 2013 | Features | Building

27/02/2014 · Gas boiler efficiency: 89.5%: 89.5%: TER (kgCO2/m2/yr) 18.72: 18.72: DER (kgCO2/m2/yr) 18.72: 18.68: TFEE (kWh/m2/yr) 54.26: 54.26 : DFEE (kWh/m2/yr) 47.18: 46.73: In the elemental recipe column, the DFEE represents the energy use of the notional dwelling; the TFEE is this figure multiplied by 1.15. The second column shows that by introducing higher performance glazing into the recipe, the

Energy Efficiency Analysis for a Multi-Story Commercial

Introduction VRF-ES-BL-001-US 011M05 4 The building consists of six stories with a total area of conditioned space at 133,595 ft². The types of conditioned space included varying sizes and miscellaneous spaces such as the office,

Uzbekistan 0.5 ton vertical gas steam boiler - Fangkuai

The company that cooperates with FANGKUAI Boiler is an information technology development company in Uzbekistan with a 5000 square meters office building. Before the winter of 2018, the company contacted FANGKUAI Boiler to provide a vertical steam boiler (LHS0.5-0.8-Y.Q) with capacity 0.5 ton per hour. Through steam distribution header, the

Planning Committee

building, product storage building, odour control system and associated tanks, emergency gas flare, back-up boiler, administration/office building, car parking, 3no. weighbridges, fire water tank and pumphouse, pipelines to existing combined heat and power (CHP) plant engines, switchgear, earth bunding, 3no. accesses to existing Giant's Park Service road infrastructure and ancillary plant/site

Typical HVAC Rules of Thumb | Abraxas Energy Consulting

.9-1.0 kW/ton: Absorbers: 18 lbs steam/ton: Boiler Horsepower: 33,479 BTU/hr = 9.8 kW: Rebuilt Systems Design: 55°F supply air : 30°-40° rise reheat coils: Dual Duct & Multizone Design: 55° cold deck: 70-105° hot deck with ODA Reset Schedule: VAV: 55°F cooling: 10% box leakage flow: 40-50% minimum fan volume: People Load: 450 BTU/person/hr: People Density: Office: 140 ft 2 /person

Heating for 70,000 square meters gas boiler heating costs

29/01/2019 · Fuel cost: 1 ton of gas boiler consumes 80 cubic meters of natural gas per hour, 8*3=24 RMB/hour; labor cost: 2000RMB, heating 70,000 square meters of office building or residential hourly cost approx is: 1920+26+24+8.3=1978.3 RMB, working 10 hours on day, working 300 days one year, the total cost of one year: 1978.3*10*300=5934900 RMB. After the heating boiler cost and heating cost

Simulation of hybrid GSHP systems utilizing radiant

chiller + gas boiler (WB) system was also simulated. The results showed that the hybrid system would provide a better indoor comfort and remains at the thermal comfort class I, the hybrid system would incur a 14.5% lower cost but would provide 43.2% more energy saving. The hybrid GSHP system could reduce 20.23 tons of CO 2 emission, while 1.39 tons more SO 2, 0.39 tons more NO x and 9.70 tons

High-Performance HVAC | WBDG - Whole Building Design Guide

07/11/2016 · For example, a typical office building minimally complying with the ASHRAE Standard 90.1 might use 75,000 Btu/sq.ft./yr. The goal for many federal buildings is 50,000 Btu/sq.ft./yr. A highly energy-efficient building using conventional comfort could have an energy use of 40,000 Btu/sq.ft./yr. or even less. A building designed and operated with

Combination Boiler with 2 Heating Zones, 230V Switching

In these diagrams, 1&2, 3&4, 5&6 have been linked together in pairs to make it easier to fit the wires into the terminals. 7 and 8 are used to connect each thermostat output to the zone valve input. 9 connects the switched outputs from the valves to the boiler input.

COMPARISON OF ASHRAE STANDARD-90.1, 189.1 AND IECC

Office building > 75,000sqft or > 3 floors SYSTEM 5 Specifications for SYSTEM 5 Built-up VAV w/ reheat Supply fan static pressure 4 in. w.c. Total fan efficiency 55% Fan control Variable speed drive Cooling Chiller Heating Hot water boiler . Energy Systems Laboratory 2011 . 14/30 . 00

4000124050-2 TMAclas F 24 - FREE BOILER MANUALS

User manual and Installation instructions - Biasi